Top 3 Strata Requisitions

Top 3 Strata Requisitions – Adrian Barden

Checklist item 30.2 Location plan agrees with surveyed parcel boundaries of base plan

Coming in at number one is the base plan not agreeing with the strata plan. In these days of automation, the most common error on strata plans is the rounding of the decimal places. Typically, the survey plan is shown to the nearest 5mm while the strata plan rounds off to the nearest 10mm.

Checklist item 30.3 Current adjoining information shown on the location plan

The requirement for current adjoining information is a contentious issue but getting the latest information from the CRE before lodging the plan can highlight changes. Where clients want to hold onto strata plans for more favourable market conditions, make sure your covering letter highlights that the plan should be returned to the surveyor for lodgement, or returned to be checked over prior to lodgement.

Checklist item 30.9 All line boundaries on floor plan defined by perpendicular offsets/connections from building(s) or other structural feature(s)

Lot boundaries need to be appropriately dimensioned from structures. Two tie distances are inadequate to fix a lot corner. Prolongations, part distances and right lines will establish a point with certainty.

Checklist item 36.2 Stratum statements refer to stated structural surfaces shown in the plan.

And a bonus requisition item to finish. Stratum statements need three components: Datum, Height and Depth. The datum needs to refer to a structure that is within the parcel. Some datums indicate that the lot has a structural base. In these circumstances no lower limit is required.

For a free quote on strata, construction or subdivision certificates contact one of our team members to discuss on (02) 4722-8278 or admin@LDC.com.au

Article Related More

Land Development Certificates Accredited Certifier

ISNSW Annual Conference 2021

This strata update looks at the legislative reform introduced in...

Learn More
Adrian Barden presenting the Australia Day Seminar 2019

Australia Day Seminar 2020

Surveyors are great at data collection. With new technology, surveyor...

Learn More
A Land Development Certificates vehicle

ISNSW Cadastral Workshop 2019

Land Development Certificates is proud to be associated with the...

Learn More
Adrian Barden presenting the Australia Day Seminar 2019

Australia Day Seminar 2019

The Low Rise Medium Density Housing Code is designed to...

Learn More